Tifton Machine Shop lifting the steeple in place with an extended boom. The boom tilts against the steeple base and another truck was tied to the front of the skidded so that the steeple could be set on the foundation.
From Wayne Blue:
The first building built by the church and remained the place of worship until 1903, when a new larger wooden building was built on McLendon St. The new building had two wings and 3 balconies. In 1956 this building was replaced by…